THE BMR POOL CONSTRUCTION PROCESSFrom your first consultation to the day you dive in: here is exactly what happens, how we build, and what makes a BMR pool different at every step.

Phase 1

DESIGN AND PERMITS
Weeks 1–3

Phase 2

EXCAVATION & STEEL Weeks 4–5

Phase 3

PLUMBING & GUNITE Weeks 5–6

Phase 4

ELECTRIC, TILE, & DECK Weeks 7–9

Phase 5

PLASTER & COMPLETION Weeks 9–10

BUILT TO A HIGHER STANDARD

Not all pools are built the same way. The materials, methods, and attention to detail during constructiondetermine how your pool performs and holds up over decades. Here is what BMR does differently.

PREMIUM STEEL REBAR

Every shell is built with upgraded steel using 4x #4 rebar, including 3/8-inch and 1/2-inch rebar for a structurally sound pool shell built to last.

LIFETIME STRUCTURAL WARRANTY

The pneumatically applied gunite shell carries a limited lifetime structural warranty, non-transferable, for as long as the original buyer owns the home. A structurally sound pool is one that retains water. That is the standard BMR builds to.

PRESSURE-TESTED PLUMBING

All plumbing lines are pressure-tested before concrete is applied over them, preventing leaks before they can ever start.

DEDICATED PROJECT MANAGER

One person owns your project from excavation to handoff. Consistent communication, one accountability chain, no dropped balls.

WHAT TO EXPECT DURING YOUR BUILD

Most BMR custom pool builds are completed in 8 to 10 weeks from excavation to final plaster. A dedicated project manager is assigned to your project from day one and remains your single point of contact through

Timeline main image

DESIGN, 3D RENDERING, AND PERMITS

Every BMR project begins on paper long before any ground is broken. Your designer visits your property for a complimentary consultation, evaluates your yard, and creates a custom 3D design built specifically for your space.

Once the design is approved, BMR handles all permit applications and required utility line locates on your behalf. You do not manage the permit process. We do.

  • Custom 3D design rendered for your specific yard dimensions and grade
  • Transparent itemized project estimate provided before any commitment
  • BMR manages all permit applications and city approvals
  • Utility line locates completed before excavation begins
  • No ground is broken until all approvals are in hand
  • A preconstruction meeting is held with your project manager before excavation begins to review the plan, timeline, and what to expect at every phase

Step 1
Timeline main image

EXCAVATION

Every BMR excavation is handcrafted and customized to your backyard. With permits approved and utilities located, our excavator sets forms and digs your pool to the exact dimensions of your approved design.

A safety fence and trash containment are set up and maintained on your property throughout the excavation phase.

  • Handcrafted and customized to your specific backyard and design
  • Custom base excavation to the exact dimensions of your approved design
  • Safety fence and trash containment maintained throughout the phase
  • Site cleaned after excavation
  • Yard access and gate requirements confirmed in advance of equipment arrival

Step 2
Timeline main image

STEEL REBAR INSTALLATION

This is where the structural integrity of your pool is established. BMR builds every pool shell on a continuous perimeter beam with upgraded steel using 4x #4 rebar.

Deck dowels are set during this phase to tie in the future concrete deck to the pool shell. Grounding clamps and bond wire are installed as standard to meet electrical safety requirements. Every connection point is tied, verified, and inspected before concrete gunite is applied over the cage.

  • Continuous perimeter beam with upgraded steel using 4x #4rebar
  • Upgraded structure includes 3/8-inch and 1/2-inch rebar
  • Deck dowels set to integrate the concrete deck with the pool shell
  • Grounding clamps and bond wire verified and inspected before gunite application begins

Step 3
Timeline main image

Plumbing

All BMR pool plumbing is professionally installed using Schedule 40 PVC. Every circulation system contains 2 anti-vortex VGB-compliant safety drains and 2 skimmers that are independently plumbed, meaning each can be isolated and serviced without disrupting the other systems in your pool.

Spa plumbing is upgraded as standard with 6 dedicated spa returns, providing full hydrotherapy coverage. Water features, overflows, and fill lines are run as separate dedicated circuits. Every plumbing line is pressure-testedbefore any concrete is applied over it. If a connection does not hold pressure, it does not get buried.

  • Upgraded schedule 40 PVC professionally installed throughout
  • 2 anti-vortex VGB safety drains meeting federal safety requirements
  • 2 skimmers independently plumbed with pool returns and overflow
  • Upgraded spa plumbing with 6 dedicated spa returns
  • All lines pressure-tested to verify zero-leak connections before burial
  • Water features plumbed on dedicated independent circuits

Step 4
Timeline main image

GUNITE SHELL APPLICATION

Your pool truly takes shape during the gunite phase. A dry-mix concrete is pneumatically applied through a hose at high velocity over the steel cage, creating a dense, uniform shell that conforms precisely to the custom contours of your design.

Steps, bench seating, tanning ledges, sun shelves, and any custom entry features are hand-sculpted during this phase by experienced craftsmen who shape the gunite while it is being applied. The completed gunite shell carries a limited lifetime structural warranty, non-transferable, for as long as the original buyer owns the home.

  • Pneumatic application produces a denser, stronger shell
  • Wall thickness maintained throughout the entire pool and spa
  • Steps, benches, tanning ledges, and custom entries hand-sculptedon-site
  • Limited lifetime structural warranty on the gunite shell, non-transferable

Step 5
Timeline main image

ELECTRICAL

All pool electrical work is professionally installed by a master electrician. Every system is installed within local code requirements and inspected before the project proceeds to the next phase. A dedicated GFCI breaker is installed as standard, and the entire pool perimeter is bonded with clamps to meet safety grounding requirements.

  • Professionally installed by a master electrician
  • GFCI breaker installed as standard
  • Perimeter bond with grounding clamps throughout
  • All work inspected before the project advances to tile and coping

Step 6
Timeline main image

TILE AND COPING

Tile and coping is handcrafted by master stone masons. This work frames the entire pool and is one of the most visible expressions of your design choices. Both the pool and spa waterline are tiled, delivering a premium finish at the water's edge.

Coping is available in 12-inch and 16-inch profiles in 3 cm or 5 cm. Ledger stone veneering is available for raised bond beams and elevated walls, adding texture and dimension to the finished pool surround.

  • Handcrafted by master stone masons
  • Tile options for pool and spa waterline
  • Coping available in 12-inch and 16-inch, 3CM or 5CM
  • Ledger stone veneering available for raised bond beams and elevated walls
  • Custom coping profiles available to match home architecture

Step 7
Timeline main image

DECKING

BMR decks are handcrafted and customized to your backyard. Once all electrical, plumbing, gas, and drainage lines are complete and inspected, deck forms are set according to your approved design plan.

PVC S&D 4-inch solid drain pipe is included as standard in all deck installations to manage surface drainage away from the pool and home.

  • Handcrafted and customized to your backyard
  • PVC S&D 4-inch solid drain pipe included as standard
  • Deck forms set after all below-grade systems are inspected and complete
  • Deck leave-out areas available for turf, gravel, or landscape integration
  • Premium stone options available for upgrade selections

Step 8
Timeline main image

INTERIOR FINISH AND PLASTER

The final phase of construction is the application of your interior finish, the surface your water touches and your family feels beneath their feet every time they swim. BMR recommends a variety of selections for interior finish, and your designer will walk you through the options during your consultation.

Once the interior finish is applied, the pool is filled, and the startup process begins. Equipment is started, water chemistry is balanced, and your project manager walks you through your new system before handing it over to you.

  • Optional finishes available in a variety of colors and textures
  • IA Micro Fusion premium micro-aggregate finish available as one of many options from BMR
  • Applied by experienced crews to the full pool and spa shell
  • Pool filled and water chemistry balanced at completion
  • Equipment startup and instructional walkthrough included as standard
  • Download Plaster Care Instructions (PDF) Here

Step 9

COMMON QUESTIONS ABOUT THE BUILD PROCESS

HOW LONG DOES IT TAKE TO BUILD A CUSTOM POOL WITH BMR?

From excavation to completion, most BMR custom pool builds take approximately 8 to 10 weeks. Overall project timeline from contract signing through permitting varies based on permit approval timing, project complexity, weather, and material selections. A dedicated project manager is assigned to your project from day one.

WHAT TYPE OF STEEL REBAR DOES BMR USE?

BMR builds every pool shell on a continuous perimeter beam with upgraded steel using 4x #4 rebar. The structure is further reinforced with 3/8-inch and 1/2-inch rebar, providing a solid and durable structural foundation for the gunite shell. Grounding clamps and bond wire are included as standard. Your designer can walk you through our steel specifications in detail during your consultation.

WHAT IS GUNITE AND WHY DOES BMR USE IT?

Gunite is a dry-mix concrete applied pneumatically through a hose at high velocity. The process creates a dense, durable shell that conforms precisely to any custom shape and allows craftsmen to hand-sculpt steps, benches, and entries during application.

DOES BMR PRESSURE-TEST THE PLUMBING?

Yes. All plumbing lines are pressure-tested after installation and before any concrete is applied over them. This verifies that every circulation line, drain, skimmer, and water feature connection holds integrity under pressure before it is permanently buried. Lines that do not pass are replaced before the build moves forward.

WHAT INTERIOR FINISH OPTIONS DOES BMR OFFER?

BMR recommends a variety of interior finish selections available in a range of colors and textures. IA Micro Fusion is one of many premium options available through BMR. Your designer will walk you through all finish options and help you select the right surface for your design during your consultation.

WHO MANAGES MY PROJECT DURING CONSTRUCTION?

Every BMR pool build is assigned a dedicated project manager who oversees every phase from excavation to final inspection and walkthrough. Your project manager is your direct point of contact throughout construction: one person, consistent communication, and full accountability for your project timeline and quality.